CURRENT PROJECTS
2025 current projects
UPDATED 06.18.25
Redi Rock wall in Alton Bay
This wall is 100 feet long and 4.5 feet high. The finished project will consume approximately 130,000 pounds of blocks and 50 tons of crushed stone.
This wall was completed on 11/15/2024.
The guardrails were completed on 05/08/2025.
Ready for pavement 05/18/2025.
Pavement completed 06/17/2025
Redi Rock blocks are available at
MICHIE CONCRETE PRODUCTS, LLC | Family Owned and Operated Since 1974
RECENT PROJECTS
GRANITE STEPS, NATURAL STONE WALKWAY
This walkway began by sourcing old granite and splitting it to fit. The temporary steps will be removed, and new steps will be installed in a new configuration. The walkway is constructed of Garden Path stepping stones set in screened soil. The soil will be planted with low ground cover.
ADDITION TO RETAINING WALL, GRANITE STEP
This is an addition to a wall I built several years ago. The step is made of old granite sourced from the property.
GRANITE STEPS, WALKWAY
This walkway was designed to connect the back entrance of the house to the shed, and support the weight of a small car to be stored in the shed.
STONE RETAINING WALL / STONE PATIO
This wall is constructed of large rocks to resemble the exiting wall. The patio is constructed of natural stepping stones.
FIELDSTONE WALL
This project started with addressing the boulders on the hill left from the foundation excavation. The large block shaped stones were lined up along the foot of the hill and filled in with some smaller stones.
The wall in front of this new home is a round fieldstone retaining wall. The wall is constructed in a dry (mortar less) fashion. This wall was completed on 10.13.22.
Old Bay Wall page
GRANITE STEP AND WALKWAY
New walkway done in Katahdin pavers and a granite step. This is an addition to a project done in 2014.
ROCKY POINT, MILTON
New walkway done in Katahdin pavers with cobble stone border, and new granite steps.
MEERYMEETING LAKE:
New/replacement walkway done in Katahdin pavers.